I-189 Exits


OK, this page is sort of a joke since I-189 is only a little over a mile in length, and its only "exits" are its two ends. But there were once grander plans. In the 1970s there were plans for a full beltway around Burlington, from what is now the end of I-189 along the waterfront, along what is now SR 127 back to I-89. As recently as 1994 I-189 was still planned to be extended to downtown between Pine and Battery Sts. Wrangling over cleanup of the Pine St. Barge Canal Superfund site (into which coal tar was dumped before World War II) held this up.

Thanks to Garrett Wollman for this information.

Beyond Exit 1 there's an additional half-mile or so of interstate highway that was built but never opened to traffic. It remains closed and abandoned today. See more at aaroads.com Lost Highways (I-189).

Mile
Marker

Exit
Number

Road

Destination

0.0
END EXPRESSWAY
0.0   I-89 SOUTH Williston
Montpelier
0.0   I-89 NORTH Winooski
St Albans
0.0   Kennedy Dr Airport
1.5 1 US 7 South Burlington
1.5
END I-189

VT Roads  Email: moroney@world.std.com